PEB versus Conventional Steel Buildings

image

Pre-Engineered Buildings (PEBs)

Conventional Steel Buildings

Design

Quick and efficient: Since PEBs are mainly formed of standard sections and connections, design time is significantly reduced. Basic designs are used over and over.

Slow: Each conventional steel structure is designed from scratch by the Consultant, with fewer design aids available to the Engineer.

Delivery

Average 6 to 8 weeks.

Average 20 to 26 weeks.

Foundations

Simple design, easy to construct and light weight.

Extensive, heavy foundations required.

Erection Cost & Time

Both costs & time of erection are minimized.
The erection process is easy, fast, step by step and with hardly any requirement for equipments.

Typically, they are 20% more expensive than PEB. In most of the cases, the erection costs and time are not estimated accurately.
Erection is slow and extensive field labor is required. Heavy equipment is often needed

Architecture

Outstanding architectural design can be achieved at low cost using standard architectural features and interface details.

Special architectural design and features must be developed for each project, which often require research and thus resulting in much higher costs.

Future Expansion

PEB Building are designed with future expansion in mind. It is simple, easy and cost effective. One supplier can co-ordinate changes.

Future expansion would be more difficult and, more likely, costlier.

Responsibility

Single responsibility for design, supply and even erection of PEBs.

Multiple responsibilities can result in questions of who is responsible when components do not fit properly.